Home › Guides › Tiling labour calculator

FREE CALCULATOR FOR TILERS

Tiling labour calculator for tilers

Price the labour for a job from your own per m² rates, add extras such as tanking and levelling, and see what it earns per day against your day rate. Having a room tiled and want to know what it should cost? See how much a tiler charges.

Areas

Your rates

Extras (optional)

Check against your day rate

Tiling labour–
Extras–
Labour total–
Including VAT–
Estimated days on site–
Earns per day–

Labour only: tiles, adhesive and grout are extra (see the material calculator). Starting values are examples: about £50/m² labour and £200–£350 a day are typical UK figures (Checkatrade, 2026). Use your own rates.

Worked example: pricing the labour for a bathroom

A bathroom with 18 m² of wall tiles at £45 per m² and a 4 m² floor at £50 per m². The shower needs tanking (£250), the floor needs levelling (4 m² at £25 per m²) and the trims and sealing come to £60. You lay about 8 m² a day on walls and floors, and your day rate is £300.

StepWorkingResult
Tiling labour18 m² × £45 + 4 m² × £50£1,010
Extras£250 tanking + 4 m² × £25 levelling + £60 trims and sealing£410
Labour total£1,010 + £410£1,420
Days tiling18 ÷ 8 + 4 ÷ 8 = 2.75, rounded up to the half day3 days
Earns per day£1,010 ÷ 3 days£337

£337 a day is in line with a £300 day rate, so the price works. Put the same figures into the calculator above and you'll get the same answer. The extras are left out of the per day figure on purpose: tanking and levelling have their own costs and drying time, so they're priced on their own.

On a small job the sum often comes out well below your day rate, because the setting up and cutting take as long as on a big one. That's what the minimum charge is for. For a full bathroom quote with materials, see how to quote a bathroom tiling job.

01
HOW IT WORKS

Price the labour, then check it against your day rate

Multiply each area by your per m² rate and add any extras priced separately, such as strip-out, tanking and levelling. Then work out how many days the tiling will take from how much you lay a day. Dividing the tiling price by those days shows what the job really earns per day. If it falls well short of your day rate, the job needs a higher rate or a minimum charge. That's common for small bathrooms with lots of cuts.

Quoting a bathroom

A step-by-step guide with a worked example for a 2.5 × 2 m bathroom.

Read the guide →

Use your rates on every real quote.

Try the real TileIQ app free. No sign-up needed, and you can send unlimited quotes free for 2 weeks.

Try TileIQ free →